estate / ae
Ready2020279.8 MEmaar Properties

Boulevard Point

Emaar Properties · Downtown Dubai

Boulevard Point is a residential tower developed by Emaar Properties in Downtown Dubai, on Mohammed Bin Rashid Boulevard next to Emaar's Fountain Views. Emaar announced the project in January 2014, with sales set to open on 25 January 2014. The announcement described 297 one- to three-bedroom residences across 63 storeys above The Dubai Mall extension, with direct access to the mall via a dedicated bridge link.

Emaar invited construction bids in 2015, and in 2016 Arabian Construction Company (ACC) won the contract to build the tower. The CTBUH Skyscraper Center lists Boulevard Point as completed in 2020, 279.8 m tall, with 69 floors — a different count from the 63 storeys given by Emaar and the architect. CTBUH names Dewan Architects & Engineers as architect and WME Consultants as structural engineer.

DP Architects, credited as design team on its own site, describes terraced lower levels forming a saw-tooth configuration and a façade of vertical fins, sun-shading ledges and projecting glass balconies. Landscape architects Gillespies designed the residents' gardens, including garden terraces on the 5th and 12th floors.

  • 01

    Terraced lower levels forming a saw-tooth configuration (DP Architects).

  • 02

    Garden terraces on the 5th and 12th floors, landscaped by Gillespies.

  • 03

    Winner, Residential Built, World Design Awards 2023 (as listed by DP Architects).

HEIGHT
279.8
METRES
YEAR
2020
DELIVERED

— Key facts

#Developer: Emaar Properties; sales launch set for 25 January 2014#Completed in 2020 (CTBUH)#Height 279.8 m (CTBUH)#63 storeys per Emaar; CTBUH lists 69 floors#Main contractor: Arabian Construction Company (ACC)#Bridge link to The Dubai Mall announced by Emaar at launch

— Architecture and construction

Main contractor
Arabian Construction Company (ACC)

— Standards and finish

— LAYOUTS
1BR2BR3BR

— Amenities and infrastructure

Swimming poolsChildren's areaGymnasiumCommunity lawnBarbecue deck

— Timeline and status

2014
PROJECT ANNOUNCED
2015
CONSTRUCTION TENDER
2016
MAIN CONTRACT TO ACC
2020
COMPLETED
2023
WORLD DESIGN AWARDS

— Sources

Fact-checked against the sources below · 2026-10-09

  1. 01Boulevard PointCTBUH Skyscraper Center · 2026-10-09
  2. 02Emaar launches exclusive 'Boulevard Point' homes, with direct access to The Dubai Mall (Emaar press release, 19 January 2014)Emaar Properties via Al Bawaba / Signal PressWire · 2026-10-09
  3. 03Emaar tenders Dubai tower constructionMEED · 2026-10-09
  4. 04ACC contracted to build 63-storey tower in Downtown DubaiConstruction Business News Middle East · 2026-10-09
  5. 05Lebanon's ACC wins Emaar contract to build Dubai towerArgaam · 2026-10-09
  6. 06Boulevard Point - DP ArchitectsDP Architects · 2026-10-09
  7. 07Boulevard PointGillespies · 2026-10-09

— ON THE DEVELOPER'S SITE

www.emaar.com

We don't sell property. Direct contact only.

↗

— About the developer

Emaar Properties

Dubai-based public joint stock company established in 1997 and listed on the Dubai Financial Market; developer of Burj Khalifa.

— Other projects in Downtown Dubai