estate / ae
Under constructionAzizi Developments

Azizi Riviera

Azizi Developments · Meydan

Azizi Riviera is a residential community by Azizi Developments in Mohammed Bin Rashid City, within the Meydan One development near the Dubai Water Canal. Its design takes the French Riviera waterfront as its model. The project was launched in July 2017 with a foundation-stone ceremony attended by the chairmen of Meydan Group and Azizi Group; it was the first project Azizi planned in Meydan One under a partnership with Meydan Group.

The announced size has grown over time: 69 mid-rise buildings at launch in 2017, 71 buildings with about 16,000 homes in 2022, and 75 mid- and high-rise buildings with about 16,000 homes in 2026, including studios and one- and two-bedroom apartments. A crystal lagoon announced in June 2021 runs 2.7 km through the community and covers more than 130,026 m². The plan also includes a retail boulevard, a lagoon walk with cafés and shops, and a green social area called Les Jardins.

The community is being built in four phases. The first handovers took place in 2022, when seven Phase 1 buildings with 1,164 units were handed over. Rêve, the fourth phase, was launched in 2022 with 24 buildings and 5,061 homes. In 2026 Azizi handed over Riviera 69, a 10-storey Phase 4 building, and Beachfront I on the lagoon on the same day.

UNITS
16000
RESIDENCES

— Key facts

#Developer: Azizi Developments#Location: Meydan One, Mohammed Bin Rashid City, near the Dubai Water Canal#Launched in July 2017; built in four phases#About 16,000 homes in 75 mid- and high-rise buildings (developer, 2026)#2.7 km swimmable crystal lagoon covering more than 130,026 m²#First handovers in 2022: 1,164 units in seven Phase 1 buildings

— Timeline and status

2017
LAUNCH AND FOUNDATION STONE (JULY)
2021
CRYSTAL LAGOON ANNOUNCED (JUNE)
2022
FIRST HANDOVERS: 1,164 UNITS IN PHASE 1
2022
FOURTH PHASE, RÊVE, LAUNCHED
2026
RIVIERA 69 AND BEACHFRONT I HANDED OVER

— Sources

Fact-checked against the sources below · 2026-10-11

  1. 01Azizi Developments launches $3.26bn project in Dubai (9 July 2017)Middle East Construction News · 2026-10-11
  2. 02UAE's Azizi reveals dates for Riviera mega project completionArabian Business · 2026-10-11
  3. 03Azizi makes waves with the launch of three new Riviera Beachfront Residences (5 October 2021)Khaleej Times · 2026-10-11
  4. 04Azizi Developments celebrates first handovers in Riviera, MBR CityAzizi Developments (press release via Zawya) · 2026-10-11
  5. 05Azizi Developments gets into handover and new launch mode at Riviera in MBR City (25 August 2022)Gulf News · 2026-10-11
  6. 06Azizi Developments' Rêve in Riviera reaches 79% construction milestone (16 July 2026)Azizi Developments (press release via Zawya) · 2026-10-11
  7. 07Azizi completes dual handovers at Riviera (6 April 2026)Middle East Construction News · 2026-10-11
  8. 08Azizi Developments Hands Over Riviera 69 and Beachfront I, Reinforcing Ongoing Delivery Momentum (31 March 2026)Azizi Developments (press release via Al Bawaba) · 2026-10-11
  9. 09Azizi launches fourth phase of premium Dubai riverfront project (2022)Zawya · 2026-10-11

— About the developer

Azizi Developments

Private property developer based in Dubai, founded in 2007 by Mirwais Azizi.

— Other projects in Meydan